How to re-run a Scheduled report for previous dates in GMS.

Description

How to re-generate a Scheduled report for previous dates in GMS.

Resolution

To run the Scheduled Report On-demand for Current date or Previous dates in GMS, follow the steps:

 

1. Login to gms application interface, /sgms

 

2. Go to Console->Reports->Scheduled Reports, choose the below options based on the requirement:

- If we want to run the report On-Demand for current date, select the report that needs to be Run and click on the Icon for Archive now for getting the report generated for current date:

 

Image

 

-  If we want to run the report On-Demand for previous dates or a range of dates, select the report that needs to be Run and click on the Icon "Archive for Date Range", Set the Start Range and End Range and Run:

 

Image

Image

 

Reports will be Archived or Emailed or both based on the Report Rule configuration.

Related Articles

  • Analytics On-Prem vs NSM Feature Matrix
    Read More
  • Analytics On-Prem End of Life and NSM Transition FAQ
    Read More
  • NSM On-Prem: Backups over SCP to Windows OpenSSH Server
    Read More
not finding your answers?